Project: N524JL/N87JL   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeremy Leonard   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1074
Total Flight Time:
Start/Last Date:Mar 17, 2021 - No Finish Date
Engine:Lycoming IO360M1B
Propeller:Sensenich 3 Blade Composite Ground Adjustable/Fixed pitch
Panel:Garmin G3XTOUCH/GNX375/G5/GTR200/GFC507
 
Friendly URL: https://eaabuilderslog.org?s=N524JL/N87JL

Home or Last Project Picture

Sep 08, 2023     Tank attach bracket angles - (9 hours)       Category: Fuselage
Today I fabricated the angles that go on the inside of the fuselage for the tank attach bracket. F796B , C,D. C,D are spacers that sit under the angle. Basically I drilled the hole on the plans, clamped/held them in place and drilled. I then removed the build up and drilled the rest of the holes. This went pretty smoothly. The dimensions in the plans for this angle is for me at least a starting point. I had to install it and remove it a few times to get the fit right and edge distance as good as I could to acceptable. Lastly I up drilled the top and bottom holes to 3/16.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.